Sunday, November 8, 2009

747 -- Visible Progress

For the last two weeks, Matt has been working really hard on the bathroom. However, there hasn't been much visual progress until now. While I know all the work he's put in, any other person might look at the room now and think, "What've you been doing?" Well, here's what he's been doing:

When he tore up the ... well ... entire bathroom, he found some water damage to the plywood floor, so he put down all new plywood. The stack for the toilet stuck out of the wall at a funny angle, which prevented us from enlarging the shower the way we wanted to. He rerouted the stack so it wouldn't interfere. Our new sink will be higher than our old one, so he rerouted the plumbing for that. The shower plumbing needed to be moved back about 8 inches, so he almost completely rebuilt that. The mirror we had in the bathroom was not recessed, and our new one will be, so Matt framed out a cabinet in the wall. He also framed out two wall inserts in what will be the shower. Then it was time to install the new can lights and exhaust fan, requiring some time in the attic (never fun).

After all this was done, Matt used a combination of drywall and moisture-resistant cement board to make the walls, ceiling, and floor. He then installed the shower pan, and built a curb between the shower and the rest of the bathroom. We painted a water-impermeable concoction called Mapegum onto the shower floor and part way up the shower walls. (Mapegum takes 12-24 hours to dry completely, so it's a huge time suck!)

Somewhere in between all of this madness we made several trips to various hardware and home design stores. We picked out tile for the bathroom floor, the shower floor, and the shower walls, as well as the new vanity, counter top, sink bowl, and sink and shower fixtures.

Yesterday, we painted on another layer of Mapegum, filled in all the drywall holes and seams with drywall mud, and set the tile for the bathroom floor. (And managed to get the new ceiling fan installed in the nursery.)

Today we'll paint on a third and final layer of Mapegum, and sand and re-mud the drywall seams. Monday night, we'll tile the shower floor and curb. If there is time, Matt might also sand and mud again.

With only 1-2 hours each night to work on this project, of course it has been slow going. And it's hard for me to accept that so much prep work has to go into the project before the visible progress begins. I have no doubt we'll have a functioning bathroom by December, but getting there will include a lot more late nights for both of us!